The Two-Staircase Mandate: Design, Compliance & Contractual Fallout
Speaker
Introduction
From 30 September 2026, the transition window for avoiding the ‘second staircase’ requirement closes. After this date, the rule is no longer a future issue for tall buildings - it becomes an immediate problem for any project currently in planning or already under construction.
This webinar navigates the updated Approved Document B and the threshold for residential buildings over 18 metres. It will discuss the legal implications of redesigning mid-project: who bears the cost of lost ‘saleable area’ and how do you draft ‘Change in Law’ clauses to protect clients from the shifting sands of Building Safety Regulator (BSR) guidance?
What You Will Learn
This webinar will cover the following:
- Threshold Clarity: Navigating the 18m rule and how ‘height’ is actually measured under 2026 guidance
- Transitional Provisions: How to ensure your project qualifies for the ‘grace period’
- The Economic Impact: Drafting clauses to handle the loss of net internal area (NIA) caused by extra cores
- BSR Interaction: Tips for successful ‘Gateway 2’ submissions involving fire safety design
This pre-recorded webinar will be available to view from Friday 28th August 2026
Alternatively, you can gain access to this webinar and 2,400+ others via the MBL Webinar Subscription. Please email webinarsubscription@mblseminars.com for more details.